EN 中文
POSITION:HOME >> NEWS >>  Company news
NEWS
NEWS
Company news

2×4000kw Francis Turbine Generator Unit get on-grid in June,2018 HL***-WJ-105 SFW4000-8/1730

3 units of Francis type finished at the end of 2017 HL***-WJ-105 SFWE630-WJ-1180

Xinsheng Hydropower Station is built on the tunnel on the source of the drinking water of Chengdu city, which requires strictly requirement of the oil control.

Prepresentatives of Sichuan Provincial Peoples Congress together with the Secretary of municipal party Committee of Deyang City visited Dongsen Hydro Equipment Ltd.

ADD: No.83, Tianshan South Road, Jingyang District, Deyang City,China

Manager: Mr. Zhang Zhizhong

Tel: +86 0838 2443007    Mobile: +86 137 0091 8663


2015-2018 Deyang Dongsen Hydropower Equipment Co., Ltd. 





官方微信