EN 中文
当前页面:首页 >> NEWS >>  Company news
5unit Propeller Units at Xinsheng HPP Finished and Get On-grid

点击:  添加时间:2018-06-15 17:17:46

Xinsheng Hydropower Station was build in 1982 with 5 units 320kw Propeller type.

It is built on the tunnel on the source of the drinking water of Chengdu city, which requires strictly requirement of the oil control. 


The origional requirement of the owner is to generator 430kw per unit, but after the design of DSSD, it could generate 485kw per hour. The project also brought a high reputation of us. Thus the owner offered us an extra amout of money for praise.


H:7.5m      Flow:5×8.3m³/s

ZD***419-LH-120  SF500-20/1730

situationoriginrequirementfinal
output320kw430kw485kw



1522154133221069.jpg













上一篇:2×4000kw Francis Turbine Generator Units get on-grid
下一篇:

ADD: No.83, Tianshan South Road, Jingyang District, Deyang City,China

Manager: Mr. Zhang Zhizhong

Tel: +86 0838 2443007    Mobile: +86 137 0091 8663


2015-2018 Deyang Dongsen Hydropower Equipment Co., Ltd. 





官方微信